You are working on a VNX Unified system that has a fault LED illuminated on the DME. What
action would you take to further analyze the system status?

A.
Perform a Data Mover failover operation to the standby Data Mover.

B.
Launch USM and perform a Verify Storage System operation.

C.
Install VNX Analyzer to capture the DME hardware status.

D.
Perform a background verify operation on the control LUNs.

Explanation: