To ensure that all aspects of the disaster recovery pla

Prev Question
Next Question

An organization has a number of branches across a wide geographical areA. To ensure that all
aspects of the disaster recovery plan are evaluated in a cost effective manner, an IS auditor should
recommend the use of a:

data recovery test.

full operational test.


preparedness test.

A preparedness test should be performed by each local office/area to test the adequacy of the
preparedness of local operations in the event of a disaster. This test should be performed regularly
on different aspects of the plan and can be a cost-effective way to gradually obtain evidence of the
plan’s adequacy. A data recovery test is a partial test and will not ensure that all aspects are
evaluated. A full operational test is not the most cost effective test in light of the geographical
dispersion of the branches, and a posttest is a phase of the test execution process.

Prev Question
Next Question

Leave a Reply

Your email address will not be published. Required fields are marked *